{"id":68064,"date":"2013-07-19T23:13:27","date_gmt":"2013-07-19T16:13:27","guid":{"rendered":"https:\/\/bahtera.jp\/beergame\/"},"modified":"2025-03-20T12:41:55","modified_gmt":"2025-03-20T05:41:55","slug":"beergame","status":"publish","type":"post","link":"https:\/\/bahtera.jp\/en\/beergame\/","title":{"rendered":"Minimizing Inventory Costs and Opportunity Loss Costs in the Beer Game to Achieve Overall Optimization"},"content":{"rendered":"<p>The purpose of the Beer Game is to recognize the importance of reducing inventory costs and opportunity loss costs (backorders) when making decisions about ordering and issuing manufacturing instructions within a supply chain that has a purchasing lead time of 4 weeks and a manufacturing lead time of 4 weeks.<br \/>\n\t\t\t\t<a href=\"https:\/\/bahtera.jp\/en\/production-control-indonesia\/\" class=\"st-cardlink\" aria-label=\"Production Control System in Indonesia\">\r\n\t\t\t\t<div class=\"kanren st-cardbox\" >\r\n\t\t\t\t\t\t\t\t\t\t<dl class=\"clearfix\">\r\n\t\t\t\t\t\t<dt class=\"st-card-img\">\r\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"150\" height=\"150\" src=\"https:\/\/bahtera.jp\/wp-content\/uploads\/2020\/12\/1-16-150x150.png\" class=\"attachment-st_thumb150 size-st_thumb150 wp-post-image\" alt=\"\u30a4\u30f3\u30c9\u30cd\u30b7\u30a2\u306e\u751f\u7523\u7ba1\u7406\u30b7\u30b9\u30c6\u30e0\u307e\u3068\u3081\" srcset=\"https:\/\/bahtera.jp\/wp-content\/uploads\/2020\/12\/1-16-150x150.png 150w, https:\/\/bahtera.jp\/wp-content\/uploads\/2020\/12\/1-16-100x100.png 100w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/dt>\r\n\t\t\t\t\t\t<dd>\r\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"st-cardbox-t\">Production Control System in Indonesia<\/p>\r\n\t\t\t\t\t\t\t\r\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<div class=\"st-card-excerpt smanone\">\r\n\t\t\t\t\t\t\t\t\t<p>It\u2019s not limited to Indonesia, but it\u2019s often said that the ultimate goals of the manufacturing industry are twofold: &#8220;cost reduction through productivity improvement&#8221; and &#8220;delivering products on time without delays.&#8221; From a management perspective, business plans are crafted to maximize growth based on market supply and demand adjustments. However, even if sales increase due to low pricing, it only reduces gross profit, leading to losses from selling and administrative expenses or non-operating costs. On the other hand, raising unit prices isn\u2019t straightforward due to market price considerations. Therefore, process management based on production plans aimed at reducing costs through &#8230; <\/p>\n\t\t\t\t\t\t\t\t<\/div>\r\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<p class=\"cardbox-more\">\u7d9a\u304d\u3092\u898b\u308b<\/p>\r\n\t\t\t\t\t\t\t\t\t\t\t\t\t<\/dd>\r\n\t\t\t\t\t<\/dl>\r\n\t\t\t\t<\/div>\r\n\t\t\t\t<\/a>\r\n\t\t\t\t<\/p>\n<h2>Overview of the Beer Game<\/h2>\n<p>The factory operates on a make-to-stock basis, but in case of a stockout, it takes 4 weeks of manufacturing lead time from issuing a manufacturing instruction to product receipt. Wholesalers (retailers) ship from inventory, but in case of a stockout, it takes 4 weeks of purchasing lead time from placing an order with the factory (wholesaler) to receiving the goods.<br \/>\nIn other words, if there is zero inventory in the supply chain, a purchase order (PO) issued by the retailer takes 16 weeks to arrive as a finished product.<br \/>\n<img decoding=\"async\" class=\"aligncenter wp-image-14371 size-full\" src=\"https:\/\/bahtera.jp\/wp-content\/uploads\/beergame3.jpg\" alt=\"\u30d3\u30fc\u30eb\u30b2\u30fc\u30e0\u306e\u6982\u8981\" width=\"717\" height=\"203\" srcset=\"https:\/\/bahtera.jp\/wp-content\/uploads\/beergame3.jpg 717w, https:\/\/bahtera.jp\/wp-content\/uploads\/beergame3-300x85.jpg 300w, https:\/\/bahtera.jp\/wp-content\/uploads\/beergame3-304x86.jpg 304w, https:\/\/bahtera.jp\/wp-content\/uploads\/beergame3-282x80.jpg 282w\" sizes=\"(max-width: 717px) 100vw, 717px\" \/><br \/>\nDespite the Beer Game\u2019s supply chain being a very simple assumption of one item per delivery destination, inventory fluctuations become significant if demand visibility is lacking between locations.<br \/>\nIn reality, where it\u2019s common to procure multiple items from multiple suppliers, the game highlights the difficulty of manual management by human systems.<br \/>\nThe purpose of a production scheduler is to optimize the entire production site, whereas the purpose of a supply chain management (SCM) system is to optimize the entire supply chain.<\/p>\n<h2>Operations Occurring Within the Supply Chain<\/h2>\n<p>Within the flow of information and goods in the supply chain, the process involves receiving orders \u21d2 placing orders (issuing manufacturing instructions) \u21d2 receiving goods \u21d2 shipping. Decision-making latitude exists only at the point of placing orders (issuing manufacturing instructions).<br \/>\nIn other words, when considering optimization at one\u2019s own site, the key is &#8220;how many to order (or produce),&#8221; which is why purchasing plans (production plans) are critical.<\/p>\n<div class=\"graybox\">\n<div class=\"maruno\">\n<ol>\n<li>Sales Operations<br \/>\nMove: Move the order form issued by the customer last week to the Week 2 start slot.<br \/>\nReview: Receive the order form from the customer.<br \/>\nShip: Ship to the customer.<br \/>\nMove: Move last week\u2019s unarrived shipped items to the customer to the Week 4 start slot.<\/li>\n<li>Purchasing Operations<br \/>\nOrder: Issue a purchase order to the supplier (decision-making latitude exists).<br \/>\nReceive: Receive goods from the supplier.<\/li>\n<li>Manufacturing Operations<br \/>\nMove: Move the manufacturing instruction issued by the factory last week to the Week 2 start slot.<br \/>\nReview: Receive the manufacturing instruction from the factory.<br \/>\nShip: Ship to the factory.<br \/>\nMove: Move last week\u2019s unarrived shipped items to the factory to the Week 4 start slot.<br \/>\nIssue Manufacturing Instruction: Issue a manufacturing instruction to the site (decision-making latitude exists).<br \/>\nReceive: Receive goods from the site.<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<p>Thus, in operating the Beer Game, the tasks assigned differ by role.<\/p>\n<div class=\"graybox\">\n<div class=\"maruno\">\n<ol>\n<li>Factory: Sales operations and manufacturing operations<\/li>\n<li>Primary Wholesaler: Purchasing operations and sales operations<\/li>\n<li>Secondary Wholesaler: Sales operations and purchasing operations<\/li>\n<li>Retailer: Purchasing operations<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<h3>Secondary Wholesaler\u2019s Operations<\/h3>\n<p>For the secondary wholesaler, the above ordering and receiving tasks are performed in the following steps:<\/p>\n<div class=\"graybox\">\n<div class=\"maruno\">\n<ol>\n<li>Receive goods from the primary wholesaler<\/li>\n<li>Move unarrived items to the retailer to the Week 4 start slot<\/li>\n<li>Receive the order form from the retailer<\/li>\n<li>Ship to the retailer<\/li>\n<li>Move the order form from the retailer to the Week 2 start slot<\/li>\n<li>Issue a purchase order to the primary wholesaler<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<h3>Retailer\u2019s Operations<\/h3>\n<p>As the downstream end, the retailer has no customers further downstream, making it the role with the least tasks in the game.<\/p>\n<div class=\"graybox\">\n<div class=\"maruno\">\n<ol>\n<li>Receive goods from the secondary wholesaler<\/li>\n<li>Receive order cards from consumers<\/li>\n<li>Sell to consumers<\/li>\n<li>Issue a purchase order to the secondary wholesaler<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<h3>Factory\u2019s Operations<\/h3>\n<p>As the upstream end, the factory has no suppliers further upstream, making it the role with the most tasks in the game.<\/p>\n<div class=\"graybox\">\n<div class=\"maruno\">\n<ol>\n<li>Receive products from the site<\/li>\n<li>Move products from the site to the Week 4 start slot<\/li>\n<li>Move unarrived items to the primary wholesaler to the Week 2 start slot<\/li>\n<li>Receive the order form from the primary wholesaler<\/li>\n<li>Ship to the primary wholesaler<\/li>\n<li>The site receives manufacturing instructions from the factory<\/li>\n<li>The site ships to the factory<\/li>\n<li>Move the order form from the primary wholesaler to the Week 2 start slot<\/li>\n<li>Issue a manufacturing instruction to the site<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<h2>Purchasing Plan and Production Plan<\/h2>\n<p>The only points with decision-making latitude are when issuing purchase orders and manufacturing instructions, where a plan must be made for &#8220;how many to order (or produce) this week.&#8221;<\/p>\n<div class=\"graybox\">\n<div class=\"maruck\">\n<ul>\n<li>If Purchasing L\/T (Manufacturing L\/T) is 1 week = This week\u2019s order (manufacturing instruction) arrives next week<\/li>\n<li>Outstanding orders (issued manufacturing instructions) also arrive next week<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<p>Under these conditions, if the forecast order quantity for next week is accurate, determining this week\u2019s order quantity to balance the following equation would theoretically result in zero inventory costs:<\/p>\n<div class=\"graybox\">\n<div class=\"maruck\">\n<ul>\n<li>(Next week\u2019s forecast order quantity + backorders) = (This week\u2019s order quantity + inventory quantity + outstanding orders)<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<p>However, in reality, this doesn\u2019t work due to the following reasons:<\/p>\n<div class=\"graybox\">\n<div class=\"maruno\">\n<ol>\n<li>Forecast order quantities are inaccurate<\/li>\n<li>Outstanding orders include &#8220;in-transit + shortage quantities,&#8221; where shortage quantity = &#8220;ordered quantity \u2013 received quantity \u2013 in-transit&#8221;<\/li>\n<li>The arrival time of shortage quantities can only be predicted up to 4 weeks ahead<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<p>So, if I were to consider optimizing my own site, the following ideas come to mind, but they\u2019re probably impossible within the short time limit during the game\u2026<\/p>\n<div class=\"graybox\">\n<div class=\"maruno\">\n<ol>\n<li>Accurately predict next week\u2019s order quantity based on market conditions<\/li>\n<li>If next week\u2019s and the following week\u2019s incoming quantities are low, increase order quantities to shorten the opportunity loss period<\/li>\n<li>If next week\u2019s and the following week\u2019s incoming quantities are high, reduce order quantities to shorten the inventory period<\/li>\n<\/ol>\n<\/div>\n<\/div>\n<h2>Reflections After the Beer Game<\/h2>\n<p>First, I was confused about starting with receiving goods. Oh, &#8220;In-Transit Week 2&#8221; means it\u2019s assumed a PO (purchase order) was issued 4 weeks ago\u2026<br \/>\nOnce a PO is issued, it\u2019s scheduled to be received in as little as 4 weeks. However, if a stockout occurs at the wholesaler due to delayed receipt from the factory, the issued PO accumulates as backorders at the wholesaler.<br \/>\nHuman nature tempts us to issue extra POs to recover backorders, but theoretically, only the cumulative order quantity is shipped. Ordering extra may reduce backorders faster but increases inventory.<br \/>\nSo, when backorders occur, a better strategy might have been to order extra upfront and reduce order quantities in subsequent weeks.<br \/>\nFor the factory, if the customer operates on Saturdays while the factory rests on weekends, leveling production by dividing Saturday\u2019s manufacturing quantity across 5 working days based on forecast data prevents delivery delays (backorders).<br \/>\nThe reason for leveling is the factory\u2019s finite capacity, but since capacity is infinite in this game, if backorders occur at the factory:<\/p>\n<div class=\"graybox\">\n<div class=\"maruck\">\n<ul>\n<li>Backorders + forecast order quantities for subsequent weeks<\/li>\n<\/ul>\n<\/div>\n<\/div>\n<p>Issuing manufacturing instructions for this amount and adjusting production once backorder resolution is predictable might be better.<br \/>\nI still don\u2019t fully grasp the significance of observing the upstream of the upstream (factory), but the textbook likely says it\u2019s &#8220;necessary for overall optimization.&#8221; Before that, I can\u2019t even optimize my own site\u2026<br \/>\nThe bullwhip effect, where rumors amplify as they spread, largely depends on the personality of the site managers. Perhaps a panicky retailer at the downstream end could have amplified the bullwhip effect even more?<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The purpose of the Beer Game is to recognize the importance of reducing inventory costs and opportunity loss costs (backorders) when making decisions about ordering and issuing manufacturing instructions within a supply chain that has a purchasing lead time of 4 weeks and a manufacturing lead time of 4 weeks.<\/p>\n","protected":false},"author":2,"featured_media":81166,"parent":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[633],"tags":[],"class_list":["post-68064","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-indonesia-production-control-system"],"_links":{"self":[{"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/posts\/68064","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/comments?post=68064"}],"version-history":[{"count":0,"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/posts\/68064\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/media\/81166"}],"wp:attachment":[{"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/media?parent=68064"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/categories?post=68064"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/bahtera.jp\/en\/wp-json\/wp\/v2\/tags?post=68064"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}